the amount by which overhead incurred during a period exceeds the overhead applied to jobs is: multiple…

the amount by which overhead incurred during a period exceeds the overhead applied to jobs is: multiple choice balanced overhead. predetermined overhead. actual overhead. underapplied overhead. overapplied overhead.

the amount by which overhead incurred during a period exceeds the overhead applied to jobs is: multiple choice balanced overhead. predetermined overhead. actual overhead. underapplied overhead. overapplied overhead.

Answer

Brief Explanations:

When actual overhead incurred is more than the overhead applied to jobs, it is called under - applied overhead. Balanced overhead means actual and applied are equal. Predetermined overhead is a rate set in advance. Actual overhead is the real - cost incurred. Overapplied overhead is when applied is more than actual.

Answer:

D. Underapplied overhead