determine what, if anything, alissa will have to change in order for her deposit ticket to be\ndeposit…

determine what, if anything, alissa will have to change in order for her deposit ticket to be\ndeposit ticket\nalissa sawyer\n10186 3rd st.\nnoname, pa\ndate november 8, 20~~\ndeposits may not be available for immediate withdrawal\nalissa sawyer\nsign here for cash received (if required)*\npeople’s bank\n064308520 765 1234\ncash\nincluding coins\n2 - 12/540\n3 1 1.7 5\n5 8 8.1 1\nsub total from other side\nsub total\n8 9 9.8 6\nless cash\nreceived\n2 6 0.0 0\n$ 6 2 9.8 6\na. the sub total is calculated incorrectly\nb. alissa forgot to sign the deposit ticket for less cash back\nc. the total is calculated incorrectly\nd. alissa forgot to date the deposit ticket
Answer
Explanation:
Step1: Calculate the subtotal
$311.75 + 588.11=899.86$
Step2: Calculate the final total
$899.86- 260.00 = 639.86$, but the ticket shows $629.86$. So the total is calculated incorrectly.
Answer:
c. The total is calculated incorrectly