which sound wave features are being described? number of wavelengths time distance traveled time

which sound wave features are being described? number of wavelengths time distance traveled time
Answer
Brief Explanations:
The ratio of the number of wavelengths to time is the definition of frequency. The ratio of distance traveled to time is the definition of speed. In the context of sound - waves, these are important characteristics.
Answer:
Frequency Speed