the box plot represents the number of minutes it takes for the students in a class to run a mile. number of…

the box plot represents the number of minutes it takes for the students in a class to run a mile. number of minutes to run a mile what is the minimum of the data? 0 5 7 13

the box plot represents the number of minutes it takes for the students in a class to run a mile. number of minutes to run a mile what is the minimum of the data? 0 5 7 13

Answer

Answer:

5

Explanation:

Step1: Recall box - plot parts

In a box - plot, the minimum value is represented by the end of the left - most whisker (excluding outliers).

Step2: Identify minimum on plot

Looking at the given box - plot, the left - most point of the whisker is at 5 on the number line. So the minimum of the data is 5.