careful, detailed planning and much paperwork enabled the empire state building to be put up in record time…

careful, detailed planning and much paperwork enabled the empire state building to be put up in record time. a progress chart and a printed timetable were issued daily. these specified everything to be done that day, identifying each truck that would drive right in onto the first floor, what it would be delivering, and who was responsible to receive it and to use the materials it carried. each steel piece was numbered to see that it went to the proper derrick and to indicate its proper place in the building. -the building of manhattan, donald a. mackay write a paraphrase of the passage.

careful, detailed planning and much paperwork enabled the empire state building to be put up in record time. a progress chart and a printed timetable were issued daily. these specified everything to be done that day, identifying each truck that would drive right in onto the first floor, what it would be delivering, and who was responsible to receive it and to use the materials it carried. each steel piece was numbered to see that it went to the proper derrick and to indicate its proper place in the building. -the building of manhattan, donald a. mackay write a paraphrase of the passage.

Answer

Brief Explanations:

Paraphrasing involves re - stating the text in different words while keeping the meaning. Here, we note key elements like planning, paperwork, progress charts, timetables, and numbered steel pieces for the Empire State Building construction.

Answer:

Thorough and meticulous planning along with a large amount of administrative work allowed the Empire State Building to be constructed in record - breaking time. A daily progress chart and a printed schedule were distributed, which specified all tasks for that day, identifying each truck that would enter the first floor, what it would deliver, and who was responsible for receiving and using the materials it carried. Each steel piece was numbered to ensure it reached the correct derrick and to mark its proper position in the building.